SHD Logistics is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

BERICOTE.jpg

Amazon speculated to take future Dartford warehouse

Developer Bericote has won planning permission for a four-storey 2.2 million sq ft warehouse at the former Littlebrook Power Station, Dartford.

The main building has a footprint of 608,000 sq ft with three internal mezzanines each of 551,000 sq ft. Including ancillary space the building will be 2.2 million sq ft, according to documents presented to Dartford council’s planning committee.

The building is 22.8m high to the warehouse parapet and comes with 599 car parking spaces.

A green roof will be installed on part of the roof of the office building, which also includes a recreation area/viewing platform at the front of the offices with views over the Thames.

Speculation has been mounting since February that Amazon are to occupy the building.

Council officials expect the third phase of the Littlebrook site to consist of mostly smaller units of around 60,000 sq ft, in order to balance the large Amazon unit.

TAGS: News Amazon
Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish