SHD Logistics is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Luxonic gains space with Smart-Space

Luxonic gains space with Smart-Space

Smart-Space, the manufacturer and installer of temporary, semi-permanent and permanent buildings, has completed a permanent production and storage facility for Luxonic at the lighting specialist's head office, manufacturing and innovation centre in Basingstoke.

The new 35m x 30m facility is a fully insulated, composite-clad steel building, with a 500 sq m mezzanine floor and a double-door unloading area. The building contains racking and bulk storage areas, offices and restrooms, as well as product-orientated wiring cells situated underneath the mezzanine floor.

Work in the new cells includes the creation of luminaires for Asda and continues Luxonic’s rollout of its energy efficient HI-MAX LED systems in Pets at Home buildings across the UK.

"Our lighting design and manufacture operation continues to grow exponentially across a number of markets including education, retail, industrial and healthcare," explains Luxonic operations director Alan Ayres.

"We were outgrowing our existing facilities and needed to expand and to improve production efficiency. The new building enables us to do exactly that, and gives our customers the chance to see our products in action at the same time. As well as being a warehouse and a shop floor, the new facility is an excellent showroom for us."
 
The five-month full design and build project entailed the removal and levelling of an unused car park prior to the building's construction and the creation of new parking facilities after its development.

"Selecting a steel-clad building was down to three main criteria - speed of construction, cost and ability to insulate extremely well," says Ayres. "Smart-Space listened to what we wanted and delivered on all counts. The project was well managed and the facility was well constructed. It suits our purposes down to the ground."

Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish